Heavy maintenance of concrete paved roads using the regional roads No. 102 and No. 142 as an example

Paweł Mieczkowski , Stanisław Majer , Bartosz Budziński

Abstract

The paper describes heavy maintenance projects carried out on two regional roads located in the West Pomerania region of Poland. The projects started in 2017 on two sections of these roads. Completely different methods were used on these two sections. On the regional road No. 142 in-place crushing, specifically the rubblizing technique was used over an almost 20 km long stretch of pavement. In the second case the old pavement was left in place and a layer of bituminous-aggregate mixture was placed to control reflective cracking. Pros and cons of these methods are presented in the paper, together with the problems noted during the works.

Keywords:

concrete pavements, reflection cracks, rubblizing, SAMI (stress absorbing membrane interlayer).

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.

Download files

PDF

Citation rules

Mieczkowski, P., Majer, S., & Budziński, B. (2019). Heavy maintenance of concrete paved roads using the regional roads No. 102 and No. 142 as an example. Roads and Bridges - Drogi I Mosty, 18(1), 25–38. https://doi.org/10.7409/rabdim.019.002

Cited by / Share


This website uses cookies for proper operation, in order to use the portal fully you must accept cookies.