The construction of viaducts with Movable Scaffolding System (MSS) is a sophisticated. However, the construction sequence has a disadvantage of an insufficiently clear distribution of the top slab weight between the scaffolding and the first casting phase of the deck. In order to solve this problem designers assume that the whole weight of the top slab is supported by the scaffolding. In fact, if the whole weight is supposed to be resisted by the scaffolding, it implies that heavier, stiffer and more expensive scaffoldings must be chosen to construct a viaduct. If the distribution of the top slab weight between the scaffolding and the first casting phase is clarified, the scaffolding can be chosen to resist lower loads, so as to lighter and cheaper scaffoldings can be selected. Moreover, if the top slab weight distribution is clarified, the stresses both at the deck and at the scaffolding can be determined more accurately. The contribution of this paper consists in clarifying the weight distribution between the first casting phase and the scaffolding. In order to achieve this objective, it identifies a number of parameters and investigates the importance of the hanger stiffness, as well as the influence of the first casting phase and the scaffolding stiffness.

Keywords:

bridge construction sequence, distribution of top slab weight, first casting phase, Movable Scaffolding System

Download files

PDF

Citation rules

Díaz de Terán, J. R., & Haach, V. G. (2016). Viaduct construction with movable scaffolding system: distribution of the top slab weight. Roads and Bridges - Drogi I Mosty, 14(4), 241–255. https://doi.org/10.7409/rabdim.015.016

Cited by / Share


This website uses cookies for proper operation, in order to use the portal fully you must accept cookies.