Onysyk, H. (2012). Analysis of the temperature changes in the steel structure of Puławy bridge over the Vistula River. Roads and Bridges - Drogi I Mosty, 11(1), 35–52. Retrieved from https://rabdim.pl/index.php/rb/article/view/v11n1p35