[1]
Mieczkowski, P. et al. 2019. Heavy maintenance of concrete paved roads using the regional roads No. 102 and No. 142 as an example. Roads and Bridges - Drogi i Mosty. 18, 1 (Mar. 2019), 25–38. DOI:https://doi.org/10.7409/rabdim.019.002.