[1]
Mistewicz, M. 2016. Economic and social aspects of long-term operation of the longest road bridge in Poland - of temporary structure. Roads and Bridges - Drogi i Mosty. 15, 3 (Sep. 2016), 231–244. DOI:https://doi.org/10.7409/10.7409/RABDIM.016.015.