[1]
Karaś, S. and Krasnowski, A. 2013. Adjustment of the existing structures located on the trunk railway line CMK to accommodate high-speed rail (HSR) based on theoretical and experimental analyses. Roads and Bridges - Drogi i Mosty. 12, 4 (Feb. 2013), 385–410. DOI:https://doi.org/10.7409/rabdim.013.025.