Roads and Bridges - Drogi i Mosty
16, 1, 2017, 15-35

Cases of failure of bridge structures during the process of pre-stressing

Juliusz Cieśla Mail
Road and Bridge Research Institute, Instytutowa 1, 03-302 Warsaw, Poland
Mirosław Biskup Mail
Road and Bridge Research Institute, Kielce Branch, ul. Chorzowska 28, 25-401 Kielce, Poland
Łukasz Topczewski Mail
Road and Bridge Research Institute, Instytutowa 1, 03-302 Warsaw, Poland
Marian Skawiński Mail
Road and Bridge Research Institute, Kielce Branch, ul. Chorzowska 28, 25-401 Kielce, Poland
Published: 2017-03-28

Abstract

The paper describes two typical cases of failure of pre-stressing cables during the construction of concrete bridges in Poland. In both cases failure occurred during the tensioning of cables and consisted of the sudden loosening of the cables as well as a destruction of the concrete in the zone under the curvilinear section of a cable. Based on a review of documentation, especially the drawings of zones of failures, and also finite element analysis, it can be concluded that the structure did not have enough reinforcement bars to transfer the tensile forces occurring on the inner curvature of the cables. Therefore, the tensile stresses occurring in these places were only transferred by the concrete. This is contrary to the basic principle of reinforced concrete, which states that tensile forces should be transferred by the reinforcement and compressive forces should be withstood by concrete.

Keywords


concrete bridges, execution, failures, pre-stressing cables.

Full Text:

PDF PDF

References


Cieśla J., Fordoński K.: Awaria kabla sprężającego i projekt naprawy estakady w węźle Ostrobramska w Warszawie. Drogownictwo, LXII, 12, 2007, 388-392

PN EN 1992-1-1 Eurokod 2: Projektowanie konstrukcji z betonu - Część 1-1: Reguły ogólne dla budynków

PN EN 1992-2 Eurokod 2: Projektowanie konstrukcji z betonu - Część 2: Mosty betonowe. Projektowanie i szczegółowe zasady

Ruan X., Shi X., Li X.: Failure analysis of tendon on bottom slab of a pre-stressed concrete box gird bridge during construction. Engineering Failure Analysis, 25, 2012, 291-303

Biliszczuk J.: Most MA 532 w ciągu autostrady A1 w Mszanie. Historia budowy. Wrocławskie Dni Mostowe, Wrocław, 2013

PN-85/S-10030 Obiekty mostowe - Obciążenia

PN-91/S-10042 Obiekty mostowe - Konstrukcje betonowe, żelbetowe i sprężone. Projektowanie

AASHTO. LFRD bridge design specification, 3rd ed. Washington (DC), AASHTO, 2004


Cases of failure of bridge structures during the process of pre-stressing

  